SUBMARINE PIPE LAYING

CLIENT

Alba de Nicaragua ALBANISA

LOCATION

Miramar, Nicaragua

DATE

01/04/2016

TECHNICAL SHEET

DESCRIPTION

Technical supervision of the submarine pipeline laying. Fuel Receipt, Plant of Fuel Storage, Receipt and Distribution of Miramar, Nicaragua.

SCOPE OF WORK

Technical supervision for the laying of 5 pipelines for reception and dispatch of refined petroleum products. Each pipeline has a length of 3.8 Km, with diameters of 8, 12, 16, 20 and 26" ranging from the land valve station to a PLEM (Pipe Line End Manifold) located at a depth of 20 m. In order to guarantee at a safe and quality level the process of pipeline laying, we counted with a team of field engineers specializing in pipelines and marine hydraulics, engineers specializing in marine works for the supervision of the labors on the vessels, a team of divers with extensive experience in pipeline laying, underwater video and photographic equipment, a multibeam bathymetry equipment for laying monitoring, high precision satellite positioning equipment as well as Safety, Hygiene and Environmental personnel (SHE). Presence of high-level personnel for evaluation of the divers surveying results and the multibeam bathymetry, on-site project modifications, documents and drawings review, development of drawings for vessels mooring and sails maneuvers, technical specifications of the buoys and routing towers, multibuoy and PLEM operating manual. Additional services Detail Engineering for the integration of the designs relevant to the different parts of the marine facilities.
Check Out Other Projects