DESCRIPTION

Dredging with assisted diving inspection of the FSPP, ODD and Tonina platforms in the Camp Pedernales.

SCOPE OF WORK

This project consisted of an emergency dredging with "Clam - Shell" dredge in the perimeters of the production platforms FSPP, ODD and Tonina of the Camp Pedernales, operated by Perenco de Venezuela, S.A. and dredged with self-propelled hopper dredge in the access channel to Pedernales. The dredging was performed using a Clam-Shell type dredge, consisting of a floating barge, crane and bucket. The operations were complemented by flat barges and a supporting tug. The dredging was carried in two stages, for the first stage, the depth was of 9 feet and of 13 feet in the second stage, for a total volume of 116,600 m3. In order to be able to develop an effective work progress, a pre-dredging, control and post-dredging bathymetric surveys were made as well as a horizontal positioning was carried by using a D.G.P.S. system.
Check Out Other Projects